Low Water Pressure – May 12, 2026

The district experienced low water pressure today. The operator searched the entire district for a water leak and was able to find the leak at an old emergency interconnect that the district set up at its inception with another MUD in the area. The leak has been capped and the water pressure is returning to normal. The operator is using Water Plant 2 to service the district while the water level is restored in the storage tanks at Water Plant 1. Special thanks to the operator’s personnel and board members with history on the district in identifying the problem.

The district apologizes for any inconvenience that the residents may have experienced.

Town Hall Information

In November 2021, Fort Bend County WCID No. 3 (WCID 3) held Elections for the authorization of $3,000,000 in Water and Drainage Bonds and $2,800,000 in Park Bonds based on cost estimates prepared by the District’s Engineer in 2019 and 2020. The WCID 3 residents voted to authorize the issuance of $3,000,000 of Water/Drainage Bonds and $2,800,000 of Park Bonds.

To see a full report from the board including project summaries, answers to questions concerning tax rates, water rates and Groundwater Reduction Program (GRP) fees, please click here.